Project Description

NSSF Building, Kenya

During the construction of the NSSF building, the construction team by NK BROTHERS was faced with a major problem: the ground was unstable and there was a landslide during the excavation phase. At this point, Minex Microtunneling was contracted to help stabilize the soil and we came in to stabilize the cut face of the excavation site. 

Minex implemented the “soil nailing” technique to stabilize the ground, installed grouted dowels, a wire mesh to create the frame and a total quantity of 160 cubic meters of shotcrete.

Project Details

DATE

1995

CLIENT

NK BROTHERS

CONTRACTOR

Minex Microtunneling