Project Description
Access Tunnel to the future Powerhouse at Tekeze, Ethiopia
Prior to building the hydropower dam, EEPCo needed to gain access. For this reason, they subcontracted Minex Microtunneling in the construction of an exploratory tunnel. This tunnel was 170 meters long, 2 meters wide and 2.2 meters high. The portal was built (blasted) on a slope of 80 degrees and the entire construction time took 2 months.
Project Details
DATE
1997
CLIENT
EEPCo
CONTRACTOR
Minex Microtunneling