Access Tunnel to the future Powerhouse at Tekeze (Ethiopia)

Construction of a Explotratory tunnel, 170 m long, 2m wide and 2.2m high. The portal was build (blasted) on a slop of 80 degrees. Construction time : 2 months

Phone: 0722 999 615

Email: info@minexmt.com

Email: skarl@minexmt.com

Postal:

P.O BOX 5279 - 00100,

Nairobi, Kenya.