Moiben Dam Pipeline (1994 - 1995)

As a sub contractor to sogea, Minex carried out the drilling and blasting for the pipeline access road and the drilling and blasting of the pipeline trench. The total quantity of blasted rock was 22 000 meter cubic.

Phone: 0722 999 615

Email: info@minexmt.com

Email: skarl@minexmt.com

Postal:

P.O BOX 5279 - 00100,

Nairobi, Kenya.