NSSF Building 1995

Following a land slide of the excavation face for the NSSF building NK BROTHERS asked for assistance from MINEX to stabilize the cut face of the excavation site. The work was carried out using the method, called "soil nailing".

Grouted dowels were installed , a wire mesh fixed and a total quanitiy of 160 meter cubic of shotcrete was applied to secure the unstable Ground